Levee work follow up #1

I have contacted BTU this morning.  I do not have a full picture of the work that will be done, but here is what I found out.

The levee will be reinforced as a result of the survey that was done.  This is an emergency response.  There are 12 points that will be worked on.  8 on East side and 4 on West side. The reinforced area will be 30′ wide.  That is all that I know from BTU.  Our contact with BTU was told this only last Thursday.  He is scrambling to find out additional information and will let me know.
I have asked for a drawing that will show where the work will occur so that we can overlay it with the trail map.  That will let us know how much of the trails will be destroyed and also help us determine a temporary re-route to keep the trails open.
Stand by.  More to follow.
Mike Record, Pres.
BVMBA
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s